Open Pit
Geological prospecting that led to Teghout Copper-Molybdenum Deposit discovery were launched as early
Tailing Dam
Tailings from the enrichment plant are removed through a pipeline by gravity flow into the tailings storage facility in the River Kharatanots gorge. Natural water flows are removed from the gorge in advance, using the hydro-technical constructions.
Processing Plant
The ore will be transported from the mine site by mining haul trucks to two jaw crusher stations. As the amount of the ore brought from the open pit varies, to ensure stability of processing and supply of the ore for the subsequent phases, ore stockpile for the crushed ore is foreseen
English version will be available soon.