Please be informed that conditioned with the repairing works of Koshaberd newly-built chimney knot of Alaverdi copper smelting plant, a 100-meter chimney of the plant is planned to launch and exploit duringĀ  08.09.2014 – 11.09.2014 period.

During that period the absolute volumes of emissions of industrial gases will be reduced to prevent the predictable increase of harmful substances in the background levels of the nearby communities by reduction of load reflecting heater and the converter.